HolidayThe holiday gift guide24 local picks, shop by shopSee the picks
PhillyShopping
Build your trip

Visitor Guide · Schuylkill River Trail

Schuylkill Crossing Swing Bridge: A 2026 Visitor Guide

The new Schuylkill Crossing swing bridge links Grays Ferry Crescent to Bartram’s Garden. How to walk or bike it, when it swings, and where to eat after.

Schuylkill River Trail · Bartram’s Garden · Walking Route · Biking · Free Things to Do

Reading time
5 minabout 1100 words
Published
November 242026
In this guide
4 placesall on one map
Category
VisitorSchuylkill River Trail

What the Schuylkill Crossing Is

A rail swing bridge, now for walkers and cyclists

Schuylkill Crossing opened to the public on the afternoon of Friday, November 13, 2026, after a ribbon-cutting at Grays Ferry Crescent. It carries the Schuylkill River Trail across the river just south of the Grays Ferry Avenue Bridge, where an old railroad crossing stood, and it closes the gap between the east bank trail and Bartram’s Mile on the west bank. It is car-free, open to people on foot and on bikes, and the Schuylkill River Development Corporation says it was designed to meet ADA requirements.

The bridge is a rehabilitated rail swing bridge. Its center truss pivots on a restored historic pier in the middle of the river so tall ships can pass, with two rehabilitated approach spans and a new fender system around the pier. The project took about $28 million, according to the Inquirer, and was led by the city’s Streets Department with the Schuylkill River Development Corporation. Ammann & Whitney (now WSP) designed it and AP Construction built it.

Schuylkill Banks describes the new crossing as a 1,000-foot trail segment. News coverage gives other lengths for the bridge itself, so don’t be surprised if numbers differ.

Seventeen years in the making

NBC10 counted seventeen years of planning and eight years of construction; Philadelphia magazine dates the start of work to 2018. Schuylkill Banks lists the city, the Commonwealth of Pennsylvania and a federal TIGER grant among the construction funders. The opening weekend ended with a Saturday community celebration, with a community walk and guided bike tours.

Bells, Gates and Three-Minute Waits

What happens when a boat comes through

River traffic decides when the bridge opens; NBC10 reports that the Streets Department and the Coast Guard coordinate the openings. When the span is about to move, warning bells sound and gates close the deck to walkers and riders. A full open-and-close cycle takes about three minutes, according to PhillyVoice and the Inquirer. If you are riding, stop at the gate when you hear the bells rather than trying to beat it.

The Streets Department also expects short closures about once a month for inspections. No source we found publishes daily opening hours for the deck, and crews were still finishing railing lighting for night use in the days before opening, so plan a daylight crossing until the city posts hours.

From Center City by Trail

The east bank: Christian Street to Grays Ferry Crescent

From Center City, follow the Schuylkill River Trail south along Schuylkill Banks. In May 2025 a 650-foot cable bridge opened on the trail, linking Center City to Grays Ferry Crescent Esplanade (near Wharton Street and Schuylkill Avenue). The Crescent is the east landing for the new crossing. Anglers fish from it, and Schuylkill Banks runs movie nights there in season.

Schuylkill Banks puts the trail’s run north of here at more than seven miles, through Center City, so you can stay on the path the whole way. The trail is also part of the Circuit Trails network and the East Coast Greenway.

The west bank: Bartram’s Mile

Once across, the trail continues through Bartram’s Garden for about 1.5 miles and ends north of 61st Street, NBC10 reports. That makes a natural out-and-back: Center City to the Crescent, over the bridge, through the garden and back.

Without a bike

To skip the trail one way, SEPTA’s Route 36 trolley stops at the main entrance to Bartram’s Garden, at 54th Street and Lindbergh Boulevard. If you drive, Bartram’s Garden has free parking in the loop off 54th Street and along 51st and 56th Streets. From November 1 to March 30, its vehicle gates at 54th and 56th Streets are open 9 a.m. to 6 p.m.

Bartram’s Garden in Late Fall and Winter

Free, open daily, with shorter building hours

Bartram’s Garden (5400 Lindbergh Blvd) is the payoff on the west bank. Admission is free for everyone and the grounds are open daily from sunrise to sunset. The garden also runs the Sankofa Community Farm and a dock and Community Boathouse with accessible ramps and kayak launches.

The buildings keep a seasonal schedule. Through the first weekend of December, the Welcome Center is open Thursday to Monday from 9:30 a.m. to 4:30 p.m. and closed Tuesday and Wednesday. Restrooms are open daily 9:30 a.m. to 4:30 p.m. over the same period, but the Welcome Center and restrooms are closed Thanksgiving Day and the day after (November 26 and 27). From January 16 to March 31, the Welcome Center opens Friday and Saturday only, and restrooms run Monday to Saturday.

What to know before you go

The Welcome Center sells snacks and drinks and lends fishing rods, so a Thursday-to-Monday visit is the easiest one. There is no café listed on the grounds. Accessible restrooms are in the Lath House, with a single stall in the Bartram House. On a Tuesday or Wednesday, bring water and food with you.

Dinner on Grays Ferry Avenue

After the walk

We found no restaurants or cafés right at either landing, so plan your meal for the way back. The standout is illata (2241 Grays Ferry Ave), a roughly 20-seat BYOB listed in the MICHELIN Guide. MICHELIN lists dinner Wednesday to Sunday, 5 to 9:30 p.m., closed Monday and Tuesday. The menu is under a dozen seasonal small plates leaning on seafood; past MICHELIN notes single out chilled mussels with pickled turnips, miso and chili oil, grilled lamb skewers with black sesame sauce, and chocolate cake with caramel and peanuts. Bring your own bottle and book ahead.

More is coming to the neighborhood. Caphe Roasters plans a new location at 2501 Oakford Street in Grays Ferry next spring, the Inquirer reported in October. It is not open yet.

For a shopping stop on the way home, leave the trail at Walnut Street and walk east to Rittenhouse Row; our Rittenhouse shop-and-eat guide pairs the stores with lunch and dinner tables.

A Half-Day Plan

Thursday to Monday, daylight

Start on the Schuylkill River Trail in Center City mid-morning, ride or walk south over the Christian to Crescent bridge to Grays Ferry Crescent, and cross Schuylkill Crossing. Spend an hour or two at Bartram’s Garden while the Welcome Center and restrooms are open, then head back across before dark. If a boat comes through, you’ll wait about three minutes at the gate. Finish with an early dinner at illata on a Wednesday to Sunday evening.

Thanksgiving week, note that the Bartram’s Garden Welcome Center and restrooms are closed November 26 and 27. If you’re in town for the holiday, our Thanksgiving parade guide covers the morning in Center City.

Good to know

Questions, answered.

When did the Schuylkill Crossing swing bridge open?

It opened to the public on Friday, November 13, 2026, after a ribbon-cutting at Grays Ferry Crescent, with a community celebration the next day.

Where is the Schuylkill Crossing?

It crosses the Schuylkill just south of the Grays Ferry Avenue Bridge, linking Grays Ferry Crescent on the east bank with Bartram’s Mile and Bartram’s Garden on the west bank.

Can you bike across the Schuylkill Crossing?

Yes. It is car-free and open to people walking and biking. When the warning bells sound, gates close and the bridge swings for river traffic, a cycle of about three minutes.

How often does the bridge swing open?

It opens when river traffic needs it, with the Streets Department coordinating openings with the Coast Guard. The Streets Department also expects brief monthly closures for inspections.

Is Bartram’s Garden free?

Yes. Admission is free and the grounds are open daily from sunrise to sunset. Through the first weekend of December the Welcome Center is open Thursday to Monday, 9:30 a.m. to 4:30 p.m., and the Welcome Center and restrooms are closed November 26 and 27.

How do I get to Bartram’s Garden without a car?

Take the Schuylkill River Trail and the new bridge, or SEPTA’s Route 36 trolley, which stops at the main entrance at 54th Street and Lindbergh Boulevard.

The places

Everywhere in this guide, on one map.

Tap a place or a dot to see it.

Attraction3 places

  • Rehabilitated rail swing bridge carrying the Schuylkill River Trail from Grays Ferry Crescent to Bartram’s Mile; car-free, opened November 13, 2026. Gates close for about three minutes when it swings.

  • East-bank landing for the swing bridge, reached from Center City by the Christian to Crescent connector; fishing and seasonal movie nights.

  • Free historic garden on the west bank with Bartram’s Mile, the Sankofa Community Farm and a Community Boathouse; Welcome Center sells snacks and lends fishing rods.

Dining1 place

  • Roughly 20-seat BYOB listed in the MICHELIN Guide, with under a dozen seasonal small plates, heavy on seafood.

AttractionDining

Stay in the loop

Philly Shopping, weekly.

New openings, sales, market events, and hidden gems, straight to your inbox.

No spam. Unsubscribe anytime.